Schnidejoch
SubidaHors Catégorie

Schnidejoch

A long HC Swiss climb: 27.4 km at 7.33%, with 2010 m of net gain and pitches up to 20.84%. Pacing discipline matters more than early strength.

Extensão
27.4km
Méd.
7.3%
Máx.
20.8%
Cume
2,504m
Ganho de elevação
2,013m
Planeje uma rota aquiTraçado pré-desenhado da base ao topo, pronto para estender no seu pedal.

A subida

Perfil de inclinação

2466 m 500 m 0.0 km6.9 km13.7 km20.6 km27.4 km
+2013 m subida−47 m descidaInclinação máxima 20.8%

Schnidejoch cycling climb profile

Schnidejoch is an HC climb in Switzerland that reads as a pure endurance test before it reads as a gradient test. The headline numbers are heavy: 27.4 km in length, 2010 m of net elevation gain, and an average gradient of 7.33%. That combination matters because the climb is not simply long, and it is not simply steep. It is long enough that pacing errors compound, and steep enough that those errors become hard to hide.

The start sits at 494 m and the summit at 2504 m. With 2013 m of total ascent against 2010 m of net gain, the profile is effectively all upward pressure. There is very little implied relief in the numbers, which means recovery has to come from how you ride the gradient rather than from meaningful downhill interruptions.

How the gradient unfolds

The available profile data does not support a precise ramp-by-ramp breakdown, but it does tell a clear story. Over 27.4 km, an average of 7.33% means the climb demands sustained torque for a long time. The maximum gradient of 20.84% changes the pacing equation. You cannot gear or pace this like a steady mid-gradient alpine road and assume the average tells the full truth.

That is the trap of Schnidejoch. A rider who treats 7.33% as the controlling number may be fine on the steadier portions, but will be exposed when the road pitches toward its maximum. On a climb this long, those steeper moments do more than raise the power requirement. They disrupt cadence, increase muscular load, and make it harder to settle back into a sustainable rhythm afterward.

Pacing and gearing notes

The right pacing strategy is conservative early and controlled late. On a climb with more than 2000 m of net gain, the first mistake is usually trying to ride the lower slopes like a shorter climb. Keep the opening effort under control, especially if you are pacing by /glossary/ftp. The goal is not to prove freshness at the bottom. It is to still have usable power when the accumulated vertical starts to bite.

Gearing should be chosen for the 20.84% maximum, not the 7.33% average. That means prioritising a low enough climbing gear to keep the pedals turning when the road steepens sharply. If your easiest gear only works when you are fresh, it is not low enough for this profile.

Practical approach:

  • Start below your sustainable climbing effort, not at it.
  • Avoid big surges on steep ramps, because they cost more late in a 27.4 km climb.
  • Use cadence as an early warning signal. If cadence collapses, shift sooner rather than forcing torque.
  • Fuel and drink before the climb feels hard, because the length leaves little room to correct a deficit near the top.

Schnidejoch is the kind of climb where the average gradient understates the challenge. The decisive feature is the combination: long duration, large net gain, minimal implied respite, and gradients steep enough to punish overconfidence.

Já pedalou essa? Compare seu tempo.

O Neverchill registra cada subida que você pedala, acompanha suas melhores escaladas e mostra como você se compara nas subidas que mais repete.

Criar conta gratuita