
Shibu-tōge
A category HC ascent in Japan covering 18.2 km at 6.7% average, gaining 1,216 m net to a 2,157 m summit over undulating terrain.
- Length
- 18.2km
- Avg
- 6.7%
- Max
- 24.9%
- Summit
- 2,157m
- Ascent
- 1,648m
The climb
Gradient profile
Overview
Shibu-tōge is a category HC climb in Japan, one of the longer paved ascents you can ride in a single sustained effort. It runs 18.2 km from a start elevation of 941 m to a summit at 2,157 m, for a net elevation gain of 1,216 m at an average gradient of 6.7%. That combination of length and altitude puts it firmly in the highest tier of climbs, and the thin air near the top adds a physiological cost that a flat 6.7% number never captures.
Look closer and the effort is harder than the net figure implies. The total ascent is 1,648 m against a net gain of only 1,216 m, which means roughly 432 m of climbing is given back to descending and re-climbing along the way. That undulation matters: every metre you lose is a metre you pay for twice. Plan your energy around the 1,648 m of real vertical work, not the 1,216 m the summit sits above the start.
How the Gradient Unfolds
The 6.7% average is a blend, not a description. On an undulating climb like this, the mean is dragged down by flatter and downhill sections, which means the climbing pitches are steeper than 6.7% to compensate. Expect the road to swing between genuine recovery and sharp demand rather than settling into one rhythm.
- Flatter and descending stretches that account for the 432 m of extra ascent and let you soft-pedal
- Repeated short climbs stacked back-to-back, each resetting your rhythm
- A steepest ramp well above the average, where the gradient bites hardest
Pacing Notes
On an undulating climb, even-effort beats even-speed. Chasing a constant speed forces you into the red on every steep pitch and wastes energy coasting the flats. Instead, hold a steady sustainable power output across the whole 18.2 km, letting your speed rise on the shallow sections and fall on the steep ones. Over 1,648 m of total ascent, that discipline is the difference between finishing strong and blowing up on the upper slopes. If you do not know your ceiling, run the FTP estimator before you commit to a target and pace just below it, leaving headroom for the steepest ramps.
Gearing
Gearing here is governed by the steepest ramp, not the average. For an HC climb of this length, fit a compact or sub-compact chainset paired with a wide-range cassette — a 34×32 or 34×34 gives you a spin-friendly bailout for the sharpest pitches and the altitude-sapped final kilometres. The goal is to keep cadence up and torque down so you protect your legs across all 1,216 m of net gain. Check your setup before the ride: confirm the cassette, derailleur capacity, and chain length actually deliver that low gear.
Summary
- Length: 18.2 km
- Average gradient: 6.7%
- Net elevation gain: 1,216 m
- Total ascent: 1,648 m
- Category: HC
Shibu-tōge rewards riders who respect the numbers. Pace to your sustainable power, gear for the steepest ramp, and budget for the full 1,648 m of ascent — do that, and the 2,157 m summit comes to you.